Our works
We Revolutionize Your Future
The Malolos – Clark Railway Project (MCRP) is the second section of the Philippine Government’s new railway linking Tutuban in Manila with the International Airport at Clark City Pampanga. CP N-02 consists of the Civil Engineering and Building works for 15.5 km of precast segmental box girder bridge, one extradosed bridge (80m + 140m + 80m), three balanced cantilever bridges (2nos 50m + 70m + 50m and 1no 60m + 100m + 60m), one steel bridge (60m length) and approximately 350m of cast in-situ bridges. The elevated station is situated at the city of San Fernando.
In Cooperation With





May 20, 2024 CP N-02: P-430 to P-433, Sta. 51+750 to Sta. 52+870 Minalin

May 20, 2024 CP N-02: P-460, Sta. 52+815 to Sta. 52+985 BR116, Santo Tomas

May 20, 2024 CP N-02: P-467 to P-470, Sta. 53+225 to Sta. 53+455 BR104, Santo Tomas


April 08, 2024 CP N-02: P-596, Sta. 58+335, San Fernando

April 08, 2024 CP N-02: P-601 to P-605, Sta. 58+520 to Sta. 58+680, San Fernando
Our works
The Malolos – Clark Railway Project (MCRP) is the second section of the Philippine Government’s new railway linking Tutuban in Manila with the International Airport at Clark City Pampanga. CP N-02 consists of the Civil Engineering and Building works for 15.5 km of precast segmental box girder bridge, one extradosed bridge (80m + 140m + 80m), three balanced cantilever bridges (2nos 50m + 70m + 50m and 1no 60m + 100m + 60m), one steel bridge (60m length) and approximately 350m of cast in-situ bridges. The elevated station is situated at the city of San Fernando.
In Cooperation With






Meanwhile, LG2 at San Fernando Station is advancing with double-shift erection work to rise above the station building.
03-March-2025 CP N-02: P-602 to P-604 CB, Sta. 58+560 to Sta. 58+640 LG2 San Fernando

The PSM viaduct erection at the Swampy Area using LG1 has reached Pambaling River, and last month, the gantry crossed the first BC bridge of the N02 project (BR104).
03-March-2025 CP N-02: P-468 to P-469, Sta. 53+295 to Sta. 53+385 LG1 Santo Tomas

Last casting and completion of the backfilling activities on the foundation of San Fernando Station. The most important station on the capital city of Dan Fernando, Pampanga.
17-February-2025 CP N-02: P-601 to P-605, Sta. 58+520 to Sta. 58+680 San Fernando Station

Completion of the Second Balance Cantilever Bridge (BR116) of the total of three included on the project. 70m main span bridge that will jump over the DPWH connection road that is still under construction.
17-February-2025 CP N-02: P-457 to P-460, Sta. 52+815 to Sta. 52+985 BR116 Santo Tomas

North-South Commuter Railway Extension (NSCR-EX) Project
Segment gluing and stitching, strand threading, and stressing of temporary post-tensioning bars at segment joint.
20-January-2025 CP N-02: P-479 to P-481, Sta. 53+770 to Sta. 53+850 LG1 Santo Tomas

North-South Commuter Railway Extension (NSCR-EX) Project
Continuous transporting and unloading of parapet walls from precast yard to swampy area.
06-January-2025 CP N-02: P-489 to P-493, Sta. 54+170 to Sta. 54+330 Santo Tomas